The AirWorks A-la-carte bundle, launched in October 2022, is tailor made for project managers who need to leverage AirWorks' best in class feature extraction for a subsection of the layers available as part of our 2D and 2D + Topo bundles.
Input files needed for A-la-carte:
.TIF (If 2D or 2D + Topo layers are selected)
.LAS (Only if Topo layers are selected)
AirWorks will prompt you at checkout if one of your a-la-carte layers requires an input file that hasn’t already been uploaded.
Base Layers:
Unlike the other AirWorks packages, there are no base layers in the a-la-carte package. Choose what you want from our order form!
Additional Deliverables
-
Geojson File Format (.geojson)
-
Esri File Format (.shp)
-
AutoCad File Format (.dwg)
-
Bentley File Format (.dgn)
-
GeoDatabase File Format (.gdb)
Topography
-
Smart Contours
-
Classified Point Cloud (Ground, Non-ground)
-
Obstruction (Areas Obstructing Ground Segmentation)
-
Breaklines
-
Multi Class Point Cloud Classification (Unclassified, Ground, Vegetation, Buildings, Wires, Pole and Telco Towers)
Additional Add-on Layers:
Utilities
-
Solar Panels
-
Fire Hydrants
-
Utility Poles - Traffic, Telephone, Light
-
Overhead Wires
-
Manholes
-
Catch Basins
Roads & Sidewalks
-
Roads
-
Pavement Markings
-
Sidewalks
-
Curbs Split - Berm
-
Roads Split - Asphalt, Concrete, Paver, Gravel, Unpaved
-
Sidewalks Split - Asphalt, Concrete, Paver, Gravel, Unpaved
-
Pavement Markings Split - Line, Poly, Symbol
-
Curbs
Vegetation & Landscape
-
Vegetation Split - Forest Dripline, Single Tree, Shrub Dripline, Single Shrub
-
Golf Course Split - Tee, Green, Fairway, Bunker
-
Vegetation
Planimetrics
-
Water
-
Concrete Pad
-
Railroad (2D)
-
Buildings
Walls & Fences
-
Walls Split - Concrete Walls, Stone, Brick or other block walls
-
Fences Split - Fence Lines, Guard Rails, Railing
Currently Estimated Turnaround Times
|
Business Days |
Project Size |
|---|---|
|
Up to 4 business days |
up to 20 acres |
|
Up to 5 business days |
20 - 30 acres |
|
Up to 8 business days |
30 - 60 acres |
|
Up to 12 business days |
60 - 80 acres |
|
13 + business days |
80+ acres |