AirWorks 2D + Topo Bundle
2D + Topo Project Sizing:
1 Acre of your project equals 1 AirWorks Credits if the 2D + Topo Bundle is selected.
Input files needed for 2D + Topo:
TIF
LAS
As a reminder, our output quality is determined by the quality of your input data. Take a look at our output confidence level document here.
Base Layers:
These layers are included with your selection of the 2D + Topo bundle.
Roads
Pavement Markings
Sidewalks
Water
Concrete Pad
Curbs
Buildings
Vegetation
Manholes
Catch Basins
Base Deliverables:
These file formats are included with your selection of the 2D + Topo Bundle:
CAD Drawing (.dxf)
Smart Contours
Obstruction (Areas Obstructing Ground Segmentation)
Add-on Deliverables
Landxml File Format (.xml)
Geojson File Format (.geojson)
Esri File Format (.shp)
AutoCad File Format (.dwg)
Bentley File Format (.dgn)
GeoDatabase File Format (.gdb)
Topography
Classified Point Cloud (Ground, Non-ground)
Breaklines
Multi Class Point Cloud Classification (Unclassified, Ground, Vegetation, Buildings, Wires, Pole and Telco Towers)
Add-on Layers:
Utilities
Fire Hydrants
Utility Poles - Traffic, Telephone, Light
Overhead Wires
Roads & Sidewalks
Curbs Split - Berm
Roads Split - Asphalt, Concrete, Paver, Gravel, Unpaved
Sidewalks Split - Asphalt, Concrete, Paver, Gravel, Unpaved
Pavement Markings Split - Line, Poly, Symbol
Vegetation & Landscape
Vegetation Split - Forest Dripline, Single Tree, Shrub Dripline, Single Shrub
Golf Course Split - Tee, Green, Fairway, Bunker
Planimetrics
Railroad (2D)
Walls & Fences
Walls Split - Concrete Walls, Stone, Brick or other block walls
Fences Split - Fence Lines, Guard Rails, Railing
Currently Estimated Turnaround Times
Business Days | Project Size |
---|---|
Up to 4 business days | up to 20 acres |
Up to 5 business days | 20 - 30 acres |
Up to 8 business days | 30 - 60 acres |
Up to 12 business days | 60 - 80 acres |
13 + business days | 80+ acres |