AirWorks 2D Only Bundle
2D + Topo Project Sizing:
1 Acre of your project equals 0.75 Credits if the 2D Only Bundle is selected.

Input files needed for 2D Only Bundle:
TIF
Base Layers:
These layers are included with your selection of the 2D Only Bundle:
Roads
Pavement Markings
Sidewalks
Water
Concrete Pad
Curbs
Buildings
Vegetation
Manholes
Catch Basins
Base Deliverables:
The 2D Only Bundle includes the following file format(s):
CAD Drawing (.dxf)
Add-on Deliverables:
These deliverables and other layers listed below can be added to your order at the price per acre listed next to it.
Deliverables
Please select the 2D + TOPO bundle to add Landxml File Format (.xml) at checkout
Geojson File Format (.geojson)
Esri File Format (.shp)
AutoCad File Format (.dwg)
Bentley File Format (.dgn)
GeoDatabase File Format (.gdb)
Add-on Layers:
Utilities
Fire Hydrants
Utility Poles - Traffic, Telephone, Light
Overhead Wires
Roads & Sidewalks
Curbs Split - Berm
Roads Split - Asphalt, Concrete, Paver, Gravel, Unpaved
Sidewalks Split - Asphalt, Concrete, Paver, Gravel, Unpaved
Pavement Markings Split - Line, Poly, Symbol
Vegetation & Landscape
Vegetation Split - Forest Dripline, Single Tree, Shrub Dripline, Single Shrub
Golf Course Split - Tee, Green, Fairway, Bunker
Planimetrics
Railroad (2D)
Walls & Fences
Walls Split - Concrete Walls, Stone, Brick or other block walls
Fences Split - Fence Lines, Guard Rails, Railing
Currently Estimated Turnaround Times
Business Days | Project Size |
---|---|
Up to 4 business days | up to 50 acres |
Up to 5 business days | 50 - 75 acres |
Up to 8 business days | 75 - 150 acres |
Up to 12 business days | 150 - 200 acres |
13 + business days | 200+ acres |