AirWorks is excited to start a beta rollout of a much requested new “Feature Elevation” bundle which includes a variety of 3D features. Please note that since this bundle is in beta, we will be adjusting the available layers and add-ons and our turnaround time based on data collected during the early stages of deployment. Your project cost will be listed on your order form and is determined by your project’s density and your contract.
Feature Elevation Project Sizing:
1 Acre of your project equals 1.75 AirWorks Credits if the Feature Elevation bundle is selected.
Input files needed for Feature Elevation:
-
TIF
-
LAS
As a reminder, our output quality is determined by the quality of your input data. Take a look at our output confidence level document here.
Currently Available base layers - June 2025:
These layers are included with your selection of the Feature Elevation bundle.
-
Roads
-
Pavement Markings
-
Sidewalks
-
Water
-
Concrete Pad
-
Curbs
-
Buildings
-
Vegetation
-
Manholes
-
Catch Basins
Currently Available base deliverables - June 2025:
-
CAD Drawing (.dxf)
Additional Deliverables:
-
Landxml File Format (.xml)
-
AutoCad File Format (.dwg)
-
GeoDatabase File Format (.gdb)
Topography
-
Smart Contours
-
Classified Point Cloud (Ground, Non-ground)
-
Obstruction (Areas Obstructing Ground Segmentation)
-
Breaklines
-
Multi Class Point Cloud Classification (Unclassified, Ground, Vegetation, Buildings, Wires, Pole and Telco Towers)
Currently Available Add-on Layers - June 2025:
Utilities
-
Fire Hydrants
-
Utility Poles - Traffic, Telephone, Light
-
Overhead Wires
Roads & Sidewalks
-
Curbs Split - Berm
-
Roads Split - Asphalt, Concrete, Paver, Gravel, Unpaved
-
Sidewalks Split - Asphalt, Concrete, Paver, Gravel, Unpaved
-
Pavement Markings Split - Line, Poly, Symbol
Vegetation & Landscape
-
Vegetation Split - Forest Dripline, Single Tree, Shrub Dripline, Single Shrub
Currently Estimated Turnaround Times - April 2022:
|
Business Days |
Project Size |
|---|---|
|
Up to 4 business days |
up to 10 acres |
|
Up to 5 business days |
10 - 15 acres |
|
Up to 8 business days |
15 - 30 acres |
|
Up to 12 business days |
30 - 40 acres |
|
13 + business days |
40+ acres |